Float Pontoon Supplier introduced that during the construction process of the trash buoy, all construction personnel are organized to hold a safety production meeting before going to work every day, so that all construction personnel are aware of the construction tasks of the day and are aware of possible safety accidents and accidents during the construction process. Corresponding response measures should be taken to analyze, so as to have a bottom line.

In order to ensure the safety of life and equipment during the construction process, the following regulations are formulated. As long as the ship transports the ship with a license, the construction equipment on the ship must have fire prevention measures, rescue equipment, and electric tools must be carefully checked before use. Unqualified tools are prohibited from being used. , When using, you must wear protective equipment and take anti-shock measures. The oxygen and acetylene cylinders for gas cutting operations must be placed correctly and at a sufficient safety distance. The operators must have the corresponding qualifications. The shell of the welding machine must be reliably grounded. The switch board must Install the leakage device, and the welding wire shall not be exposed. Operators must have appropriate qualifications, and they must use fall arresters and wear safety belts when working at heights up and down straight ladders. For high-altitude operations, safety belts and tool bags must be used in accordance with regulations. Throwing tools or materials up and down is prohibited. When installing the trash buoy, a ship must be rented, and the operator must wear a life jacket.

The above content is organized and shared by Jet Ski Roller Dock Supplier, hoping to help those in need.


コメント